This weeks work

Joined
Oct 23, 2006
Messages
1,461
Well, I'm finally getting faster without sacrificing quality.
This week I:
Glued up and finished out the handles on a Gasconade, a soldier river. Ground and finished up three psks.
After that I got this done:
4867284841_7780963a61_z.jpg


Got a soldier river ready for gluing up the scales, got a blackwater to the glued up stage, got a turley branch and a 1/4" thick soldier river cut out and profiled,got five psks ground and ready for heat treat and ground the one off knife and did some hand sanding on it.:cool:
I'm finally feeling like I'm making some headway and not spinning my wheels so much.
Special thanks goes to Andy Roy and Scott Gossman for all their tips and info they have shared with me. Two of the best guys in the business imo.
Thanks for looking,
Iz
 
j,
They are $30.00 shipped, man.
Let me know if you want one, I'll put you on the list. About a months wait time on them right now.
Later,
Iz
 
You're kickin' ass Iz. Keep them coming! And don't slow down with those ingenious designs you've been busting out. :thumbup:
 
Thanks, Cody. I appreciate the encouragement, man.
Things have slowed down some this week, I've got two hidden tangs in this batch.:( Time eaters they are.
Iz
 
Back
Top