- Joined
- Sep 9, 2015
- Messages
- 3,553
Slower progress than anticipated.
But both doors are now fully functional. One of which i built from scratch.
All pest control measures are complete.
Wiring is next up. FINALLY.
And I can get some lighting in there. Then its back to making expensive dust!!!
First things will be
8670 machetes or medium choppers.
Z-wear EDC stuff or camp stuff.
K110 (D2) camp or EDC knives.
Hopefully I make some decent knives! Been a bit since I was in my element.
But both doors are now fully functional. One of which i built from scratch.
All pest control measures are complete.
Wiring is next up. FINALLY.
And I can get some lighting in there. Then its back to making expensive dust!!!
First things will be
8670 machetes or medium choppers.
Z-wear EDC stuff or camp stuff.
K110 (D2) camp or EDC knives.
Hopefully I make some decent knives! Been a bit since I was in my element.